Call Us: +86-29-89820090Email: sales@hysolidcontrol.com

5.Horizontal Directional Drilling

HDD is applied to urban municipal construction and electrified pipe network transformation. Communication cable laying and the big and small rivers, lake and the horizontal directional crossing construction when the building cannot be demolished, especially in the environmental protection and municipal pipe network expansion project and the horizontal directional crossing construction of large pipeline crossing river project. HYANG designs and manufactures mud recycling systems for horizontal directional drilling according to different geological conditions and customer’s requirements, our mud recycling systems available to different models to match with GD Drilling Rig, such as 250GPM ( 60m³/h ) , 500GPM(120m³/h ) , and 1000GPM(240m³/h ).

Horizontal Directional Drilling 52

The mud recovery of horizontal directional drilling is mainly to recover the larger particles in the mud. The main equipment of the mud system is mainly composed of vibrating screen, desander and desilter, sand pump, mud tank, etc. HDD mud produced by HYang The recovery system is integrated, which is convenient for transportation and centralized treatment of mud, which effectively saves the space on the mud site.